 |
 |
|
|
 |
|
| |
|
 |
|
 |
| |
PROJECTS :
INDUSTRIAL
| Project: |
BRL Hardy Wines |
| Location: |
Nannup WA |
| Contract: |
Woods Bagot Architects |
| Designer: |
Construction |
| Value: |
|
This project featured a massive 2,000 m2 Thermomass barrel store, production area, offices, tasting room and vintage cellar incorporated into the 7,000 tonnes winery. Construction methods were tilt-up concrete and steel frame.
|
| Project: |
Busselton Building Products Showroom / Warehouse |
| Location: |
Busselton WA |
| Contract: |
Design & Construction |
| Designer: |
Innovest Construction |
| Value: |
|
The project comprised a showroom office building and separate storage facilities. Construction was brick and steel frame clad in colorbond.
|
| Project: |
Flying Fish Cove Wines |
| Location: |
Willyabrup WA |
| Contract: |
Design & Construction |
| Designer: |
Innovest Construction |
| Value: |
|
A contract winery that was designed to crush 1000 tonnes in its first year, Flying Fish incorporates a Thermomass barrel store and a design that will allow an expansion to 5000 tonnes.
|
| Project: |
Watershed Wines – Winery |
| Location: |
Margaret River WA |
| Contract: |
Construction |
| Designer: |
Grounds Kent Architects |
| Value: |
|
A new premium brand that will crush 400 tonnes in the first years rising to 2,500 tonnes in later years with the fruit being grown on the estate. The project has public tasting areas, administration, restaurant and cafe buildings. The production facilities have a state of the art fit out.
|
| Project: |
Laurance Wines – Winery Store |
| Location: |
Willyabrup WA |
| Contract: |
Design & Construction |
| Designer: |
Innovest Construction |
| Value: |
|
This tilt-up concrete project included winery production areas, barrel storage and public tasting areas. The winery has a capacity of 1500 tonnes and was completed in 1997.
|
| Project: |
Snyder Warehouse |
| Location: |
Margaret River WA |
| Contract: |
Design & Construction |
| Designer: |
Innovest |
| Value: |
|
These industrial strata title factory units featured tilt up concrete constrcution and steel roof.
|
| Project: |
Harwood Poultry Sheds |
| Location: |
Margaret River WA |
| Contract: |
Design & Construction |
| Designer: |
Innovest |
| Value: |
|
The project was a free range egg production facility constructed of steel frame walls and an insulated panel roof.
|
| Project: |
Geyer Poultry Sheds |
| Location: |
Serpentine WA |
| Contract: |
Design & Construction |
| Designer: |
Innovest |
| Value: |
|
The project was a free range egg production facility constructed of steel frame walls and an insulated panel roof.
|
| Project: |
Jefthomson CA Fruit Store |
| Location: |
Shepparton Vic |
| Contract: |
Design & Construction |
| Designer: |
Innovest Construction |
| Value: |
|
This Thermomass CA store is intended for the storage of 10,000 bins of apples at a temperature of 0-2 degrees Celsius. Each of the eight rooms has to be gas tight as the fruit is stored in nitrogen under pressure. The building has a hollow core concrete roof with insulation and metal decking.
|
|
|
|